Oxley Road Rail Bridge

Queensland

  • Discipline: Rail
  • Owner: Queensland Government – Queensland Rail
  • Value: $46 Million
  • Scope: Replacement of the 107-year-old rail bridge with a new rail bridge to span the proposed new four lane Oxley Road. 
  • Role: Fission was engaged to produce the BOQ, P50/P90 cost estimates, cash flow, risk analysis, construction program, construction methodology including temporary works. Fission developed a detailed methodology for pre-casting and installing a 1200t bridge deck unit.